Skip site navigation and jump to page content

The Restoration Project

SPU has been working with an engineering firm for some time to determine how to bring Alexander Hall up to today’s seismic standards. No one anticipated, however, what would be discovered in the spring of 2013. Analyzing the building’s original unreinforced masonry construction and the wear and tear of 121 years, engineers determined that Alexander represented a potential safety risk.

Faculty and staff were immediately relocated to another facility, and planning began for a major seismic retrofit and interior renovation.

What was an unforeseen development became an opportunity: to fully restore and renew Alexander Hall for the future.

Exterior of Alexander HallInterior demolition

The goal is to complete the restoration project by the beginning of the 2014–15 academic year, one year before the University celebrates its 125th anniversary.

The Alexander Hall of the Future

The project is designed to carefully preserve the exterior of Alexander Hall while focusing on two critical components. First, it will accomplish a seismic retrofit, helping to ensure the safety of Alexander Hall’s occupants in the Pacific Northwest’s earthquake zone. Second, it will make much-needed interior improvements 50 years after its last remodel, creating a modern environment for future scholarship and mentorship. The craftsmanship will reflect the period influence of the building’s original construction date.

Architect rendering

Improvements will include:

  • ADA (Americans With Disabilities Act) accessibility enhancements, including elevator
  • HVAC (Heating, Ventilation, and Air Conditioning) installation
  • Fire and emergency notification system
  • Sprinkler system
  • Electrical, data, and telecommunications upgrade
  • Historic finishes on main-floor interior woodwork
  • Dedicated space for memorial honoring SPU students and alumni who died in service to our country
  • Office, common area, and chapel furnishings

When the project is complete, it will reflect Alexander Hall’s historic landmark status as well as its vital role in SPU’s future.

Seismic Retrofit

Retrofit rendering

A new steel-braced frame (red) and concrete foundation (blue) will be retrofitted to Alexander Hall’s east and west walls. The black dots represent all locations where the steel frame will be secured to the existing masonry. The new frame will provide both gravity and lateral support for the existing floor systems and exterior masonry.

Interior Improvements

The four floors of the restored Alexander Hall will include 35 faculty offices, two conference rooms, a dean’s office and department suite, and a chapel. The stairwell, first-floor hallway, and conference rooms will be renovated in a period theme with new flooring, trim, and period light fixtures.

Hallway rendering

Room renderingStairway rendering

Alexander Chapel

Alexander Chapel will undergo alterations to accommodate the building’s new steel frame, but the stained glass windows will remain, and where feasible, existing masonry will be exposed. Period updates will be included.

Chapel renderingChapel rendering

Give now
close(X)